OUR N E W   W E B   S I T E   "WORLD AIR FORCE NEWS"
 
  
 
 

WORLD AIR WAR HISTORY


 
  HOME > 4/5th Generation Fighters News >

Indian Naval variant of LCA Tejas to undergo tests in Goa soon

Indian Naval variant of LCA Tejas to undergo tests in Goa soon

The naval variant of light combat aircraft (LCA) 'Tejas' will soon undergo carrier compatibility tests at the newly commissioned shore-based test facility at the Indian naval base INS Hansa in Goa, the LCA's programme director Kota Harinarayana told TOI on Friday.

"Before we go to the ship, we have to do something on the ground that is similar to the ship," Harinarayana said, while pointing out that the shore-based test facility is primarily a ramp - similar to the ones on aircraft carriers - which facilitates ski-jump take-off and arrested landing of a naval aircraft. "The aircraft will go to the test facility in a month's time," he added.

"Apart from enabling carrier compatibility, the new facility will aid certification of the LCA naval variant, which is critical to the LCA's future induction in the Indian Navy," he said.

The LCA (Navy) is India's first indigenous effort to build a carrier-borne naval fighter aircraft, a vital ingredient in the Navy's expansion plans. It is designed to operate from future indigenous aircraft carriers that the Indian Navy plans to acquire.

Harinarayana is regarded as the chief architect of the LCA programme, which was launched in 1980 as part of the plan to replace the Indian Air Force's (IAF) ageing fleet of MIG-21 aircraft. He spoke to TOI on the sidelines of a talk on 'Aircraft designing in India', jointly organised by the Centre for Advanced Strategic Studies and the Aeronautical Society of India. Former vice-chief of air staff Air Marshal (Retd) Bhushan Gokhale chaired the event.

In December 2013, the IAF gave its operational clearance to the LCA Air Force variant and also cleared the same for full-scale production at the Hindustan Aeronautical Limited facility in Bangalore, Harinarayana said. "We expect the aircraft to be rolled out for induction into the Air Force later this year and hopefully the IAF will raise an independent squadron for the LCA," he said.

He said, "The IAF has placed an initial order of 40 LCAs which are to be delivered over the next four to five years. We have their (IAF's) commitment for another 80 to 90 LCAs in future. The Air Force and Navy collectively require 200 LCAs."

Harinarayana added that the LCA had also evinced keen interest from foreign countries. "However, our immediate focus is on meeting the Air Force and Navy's requirement for the next three years. Supply to foreign countries remains a part-commercial, part-diplomatic matter, and may still take some time to come through. The priority for now is to enhance the production capacity and to continue working on the LCA Mk-II variant, which is expected to go operational in four to five years following flight and other tests."

He conceded that both LCA variants will work on the imported GE-404 engines as it will take some more years for the indigenously developed Kaveri engine to be ready for use in these aircraft. "We still have to fully achieve the reliability and performance of the Kaveri engine. We have tested for 50 hours' flying in a transport carrier, but we still have to improve," he said.

Apart from enabling carrier compatibility, the new shore-based test facility will aid certification of the LCA naval variant, which is critical to the LCA's future induction in the Indian Navy.


Source: Pune, By Vishwas Kothari, TNN News (timesofindia.indiatimes.com) - 29 March2014

Photo: The Indian Naval Aviation LCA Tejas Fighter Aircraft (Photo by DRDO)

(29.03.2014)


 
  CONTINENTAL NEWS:

American Air Force News
African Air Force News
Asian Air Force News
European Air Force News
Middle Eastern AF News
Ocean Air Force News


• First ECRS Mk2 radar for UK Typhoon fleet delivered to BAE Systems for integration

(21.04.2023)
The milestone is the latest step towards bringing the world’s most capable combat air radar into Royal Air Force service by the end of the decade....>>

• USAF asks for 72 fighters in 2024, and it might happen again

(6.04.2023)
US Air Force asks for 72 fighters in 2024, and it might happen again...>>

• In volo con Leonardo: the new work orientation pathway of the STEMLab project

(22.02.2023)
Helping to build the future of the younger generations by promoting scientific learning in schools: this is the aim of an initiative just launched by Leonardo within STEMLab as par...>>

• German Air Force F-35 program

(17.02.2023)
Lockheed Martin and Northrop Grumman have signed a letter of intent with Rheinmetall AG as a promising strategic source of supply for the F-35 center fuselage. This potential partn...>>

• Lockheed Martin F-35 Fleet Now at 894 Aircraft After 141 Deliveries in 2022

(30.12.2022)
Pentagon and Lockheed Martin Finalize Lot 15-17 Agreement, Capping a Year of International Growth...>>

• Northrop Grumman B-2 Spirit Stealth Bomber Successfully Test Fires First Long-Range Stealth Missile

(22.08.2022)
A B-2 Spirit strategic bomber has successfully test-fired its first long -range stealth standoff missile, Northrop Grumman announced in a press release on Thursday....>>

• USN FA-18E Super Hornet, USS George H.W. Bush (CVN 77) Atlantic Ocean

(15.09.2021)
USS George H.W. Bush (CVN 77) F/A-18E Super Hornet aircraft...>>

 



       info@xairforces.net Webmaster: REFLX DESIGN - © 2011 xairforces / Aviation Society,