OUR N E W   W E B   S I T E   "WORLD AIR FORCE NEWS"
 
  
 
 

WORLD AIR WAR HISTORY


 
  HOME > AMERICAN AIR FORCE NEWS >

Lockheed Martin Delivers 100th F-22 Raptor Air Dominance Fighter to the U.S. Air Force

Lockheed Martin Delivers 100th F-22 Raptor Air Dominance Fighter to the U.S. Air Force

Lockheed Martin formally delivered the 100th F-22 Raptor air dominance fighter to the U.S. Air Force in ceremonies here today. The milestone aircraft (Air Force serial number 05-0100) will be assigned to the 90th Fighter Squadron at Elmendorf AFB, Alaska.

"The F-22 is a testament to the skills of engineers and technicians from more than 1,000 companies across America," said Lockheed Martin Executive Vice President and F-22 Program General Manager Larry Lawson. "This delivery marks a significant milestone for the U.S. Air Force and the F-22 program. The Raptor is providing top cover for America and our allies. We have developed the most capable fighter in the world, which is exactly what the men and women defending us deserve."

During the ceremony, Secretary of the Air Force Michael Wynne signed the DD-250 form, the official U.S. government acceptance document. The 90th Fighter Squadron at Elmendorf is expected to receive its full complement of 20 F-22s by the fall of 2008.

Starting with the first parts being made, production of each Raptor takes a total span of approximately 30 months. The various parts are sent to the Lockheed Martin facility in Marietta, Ga., for final assembly. With 30 positions on the assembly line in the 3.5 million square foot main production building in Marietta, the elapsed time in the major mate and final assembly process is approximately 12 months.

The forward fuselage of the F-22 is assembled in Marietta. The mid-fuselage, which contains many of the aircraft's subsystems and the weapons bays, arrives in Marietta from the Lockheed Martin facility in Fort Worth, Texas. The aft fuselage, which contains the equipment and connections needed for installation of the F-22's F-119 engines, designed and built by Pratt & Whitney, arrives from the Boeing facility in Seattle, Wash. After fuselage mate, using laser alignment to ensure a precise fit, the aircraft receives its vertical and horizontal stabilizers, as well as its wings. The verticals are assembled at the Lockheed Martin plant in Meridian, Miss., and Boeing builds the Raptor's fuel-carrying wings.

Raptors are currently assigned to five U.S. bases. Flight testing takes place at Edwards AFB, Calif. Operational tactics development is ongoing at Nellis AFB, Nev. Pilot and crew chief training takes place at Tyndall AFB, Fla. Operational Raptors are assigned to Langley AFB, Va. and at Elmendorf AFB, Alaska. Raptors will also be based at Holloman AFB, N.M., and Hickam AFB, Hawaii.

Headquartered in Bethesda, Md., Lockheed Martin employs about 140,000 people worldwide and is principally engaged in the research, design, development, manufacture, integration and sustainment of advanced technology systems, products, and services. The corporation reported 2006 sales of $39.6 billion.


Source: MARIETTA, Ga. ---
Lockheed Martin Aeronautics Company; issued Aug. 29, 2007
http://www.defense-aerospace.com

Photo : www.xairforces.net


(9.12.2007)


 
  CONTINENTAL NEWS:

American Air Force News
African Air Force News
Asian Air Force News
European Air Force News
Middle Eastern AF News
Ocean Air Force News


• Announcing the Royal Canadian Air Force 2024 Logo

(6.07.2021)
With the RCAF Centennial anniversary only a thousand days away, Lieutenant-General Al Meinzinger, Commander of the Royal Canadian Air Force and Chief Warrant Officer John Hall, the...>>

• Jamaica to fly Bell 505 JetRanger X light helicopter

(11.05.2021)
Jamaica Defence Force receives milestone aircraft to support public safety and future pilot training...>>

• Leonardo AW139M wins Colombian presidential deal

(15.02.2021)
Colombia the new presidential transport helicopter of the Republic of Colombia will be an AW139 supplied by Italian aerospace firm Leonardo in the second quarter of this year, the ...>>

• Final Airbus SC-105 (C-295MPA) handed to Brazil

(12.02.2021)
Brazil the Brazilian Air Force (FAB) received its third and final Airbus SC-105 Amazonas search and rescue (SAR) aircraft on December 9, during a handover ceremony at Seville, Spa...>>

• Ex-ltalian Coast Guard Agusta-Bell 412CP Grifone lands in Uruguay

(10.10.2020)
Uruguay's Ministry of National Defence announced on August 14 that the first of two Agusta-Bell 412CP Grifone helicopters acquired for the Uruguayan Navy had arrived in Montevideo....>>

• Another Alarus CH-2000 Antarqui delivered to Peruvian Air Force

(9.09.2020)
An Additional SEMAN Alarus CH-2000 Antarqui, serial number 492, has been completed by the Peruvian Air Force Maintenance Service (SEMAN) and was flight tested on July 9....>>

• Brazilian Navy - Return to base after another successful Antarctic campaign

(4.05.2020)
A very special photo was taken on the 8th of April in the Brazilian Navy’s base at Sao Pedro da Aldeia. ...>>

 



       info@xairforces.net Webmaster: REFLX DESIGN - © 2011 xairforces / Aviation Society,