OUR N E W   W E B   S I T E   "WORLD AIR FORCE NEWS"
 
  
 

WORLD AIR WAR HISTORY


 
  HOME > ASIAN AIR FORCE NEWS >

The total order backlog for Il-76MD-90A aircraft is assessed at 1 trillion rubles

The total order backlog for Il-76MD-90A aircraft is assessed at 1 trillion rubles

The total order backlog for the advanced military-transport Il-76MD-90A (Il-476) aircraft is assessed at 1 trillion rubles, CEO of Ilyushin Company, Viktor Livanov, said. AEX.ru

"Taking into account the development of the whole aircraft family on the basis of Il-76MD-90A (including advanced tanker aircraft), we believe that the order backlog for these jets will reach 1 trillion rubles soon", - Viktor Livanov said.

He also noted that the aircraft has a great export potential and it will be offered to the current operators of Il-76 and other Russian-made aircraft. According to Livanov, the serial production of this jet will be carried out in Russia using the advanced technology of 3D digital design.

Viktor Livanov also said that the flight testing of Il-76MD-90A should be completed in the third quarter of 2014, while the first stage of the testing will be completed in the third quarter of 2013. At present the jet resides at Ulyanovsk-based Aviastar-SP. The aircraft has already performed several flights. It is being prepared for flight to Zhukovsky (Moscow Region), where the first stage of the flight testing will be started.

We remind you that Russian Ministry of Defense and United Aircraft Corporation signed a contract in October 2012 on delivery of 39 military-transport Il-76MD-90A aircraft manufactured by Aviastar-SP. The value of this contract is about 140 billion rubles.

Source: Russian Aviaton News - 28 December 2012

Photo: The Russian Air Force Ilyushin IL-76MD-90A (IL-476) Aircraft (Photo by files)


(28.12.2012)


 
  CONTINENTAL NEWS:

American Air Force News
African Air Force News
Asian Air Force News
European Air Force News
Middle Eastern AF News
Ocean Air Force News


• Pacific Air Forces follow Aero India 23 with Air Force training exercise in India

(13.04.2023)
Airmen from the U.S. are participating in the exercise Cope India 2023–or CI23– with the Indian Air Force, April 10-21, 2023. The exercise will take place across Indian Air Force s...>>

• India signs contracts to acquire air and coastal defence systems

(31.03.2023)
The Indian Ministry of Defence (MoD) has awarded contracts to supply Akash Weapon System (AWS), next-generation maritime mobile coastal batteries-long range (NGMMCB-LR), and BrahMo...>>

• PLA's 73rd Group Army receives ZBL-09 vehicles

(31.03.2023)
The Eastern Theater Command (ETC) of the People's Liberation Army (PLA) has inducted China North Industries Group Corporation's (Norinco's) ZBL-09 (also known as Type 09) armoured ...>>

• Taiwan set to start receiving Javelin missiles in 2023

(31.03.2023)
Taiwan is expected to take delivery of 400 missiles for Javelin man-portable anti-tank systems purchased from the United States between the second half of this year and 2024, a mil...>>

• First C-130J-30 for Indonesia arrives in country

(10.03.2023)
Indonesia receives first C-130J-30 Super Hercules aircraft from Lockheed Martin...>>

• Beijing Accuses Washington of Jeopardizing Peace in Taiwan Strait After US Spy Plane's Flyover

(28.02.2023)
Tensions between China and Taiwan escalated last year following an array of trips to the island by US and European officials....>>

• US orders two PZL Mielec M28 Skytrucks for Nepal Army Air Wing

(13.02.2023)
On 3 February 2023, PZL-Mielec has been awarded a USD 30 million contract to supply the Nepal Army Air Wing with two M28 Skytrucks. The two Block 05 aircraft will be delivered unde...>>

 



       info@xairforces.net
Webmaster: REFLX DESIGN - © 2011 xairforces / Aviation Society, XAIRFORCES.NET TÜRKÇE, DIFLEK.COM TARAFINDAN DESTEKLENMEKTEDİR.